What sets Design Right Kitchens apart from other designers?
Let us introduce you to the designer, Gary Townsend. Not only is Gary a kitchen designer, he is an avid chef, as well. He has over 20 years of experience drafting design and has been a contractor himself. These combined talents ensure master craftsmanship in the construction and useful designs that maximize space and utilization.
Gary’s knowledge of construction and his cooking background make him the ultimate kitchen designer. Our designs provide beauty, style, and most importantly, function. What is the process from design to build?
A deposit or a retainer begins the process. A final design plan is presented for customer approval. Once approved, we submit for the necessary permits. Once the permits are ready, we schedule the date to begin the installation/construction.
How long will we be without a kitchen during the remodeling process?
We do our best to minimize the time without a kitchen during the remodeling. The length of time varies depending on the complexity of the design. The average time frame is generally between 4 to 8 weeks without full kitchen privileges.
|
What can we expect during our free consultation?
In your initial visit to our office in Fairfield, NJ, we will listen to your ideas for your project and give you a hands-on look at cabinetry, counter tops, and hardware. After getting a feel for the style and scope of your project, we will set an appointment to take on-site measurements at the location.
How long does a remodel take?
Depending on the size of the job and the complexity of the design, it varies. The average kitchen is about 6 to 8 weeks.
The average bathroom is approximately 4 to 8 weeks. Do you guarantee your work? For how long?Most cabinetry sold has a limited lifetime warranty. The terms of your specific custom cabinet order will be provided. We guarantee our installation and construction for 5 years.
|